Overall Project Progress Indicator Bar in Percentages

Dear All,

I currently work on a project of 40,264 source words which I have promised to deliver in 29 business days. This means that I need to progress with 1,389 translated words per day, or with 3.44% per day. If Trados had simple visual project progress indicator next to the project's name, it would be possible to aim for a progress of, say, 4% per day.

It is inconvenient to run WIP reports several times per day to make sure I am on track with the required progress. Also, a WIP report simply shows at the end the number of translated words, which still means that additional calculations are needed to check if current progress is satisfactory.

Other linguists have requested the same feature on several occasions in this community, and four years ago the feature was proposed here:

https://community.rws.com/ideas/translation-productivity-ideas/i/trados-studio-ideas/overall-project-progress-indicator-bar

I am not sure why Trados developers are so difficult to persuade that this is a must have feature. For projects containing multiple files of different sizes, this would be of great help and much appreciated.

Please, visit the above page and vote the suggestion up.

Best regards,

Pavel Tsvetkov