Hello,
I've noted a potential issue
I've set my working hours in the system (from 9 am to 6 pm).
However, when I enter a task day 1 at a later time (e.g. 8pm), the planner still adds the work starting day 1 so I have to change this manually each time.
For instance, I received a 4000 word project to translate the 10th at 8pm and delivery is planned the 13th. When I create my task (at 8pm), the workload planner automatically adds a workload for that same day and another one for the following. But it is past 6pm (my EOB time set in the system), so I have to go in the WP tab and manually postpone each task.
Have I done something wrong or is this not an active feature?