I prefer to start projects on the basis of previous projects for the same client/end-client.
When I do, I get five (5) messages before I can do my thing.
Message 1 (triggered by the project used to add the previous job):

Message 2 (when selecting a different project):

Message 3 (without having done anything):

Message 4 (without having done anything):

Message 5:

The irritation mounts each time I have to click on the five OK buttons in order to get started.
I understand why a message is appropriate, but one should be enough.
I wonder if someone could tell me that this message sequence is by design, and what I can do to get rid of some of them (other than using project templates).
All the best,
Jon
Generated Image Alt-Text
[edited by: Trados AI at 9:38 PM (GMT 0) on 28 Feb 2024]

Translate