Introduction
Signoff Verify Settings represents a batch task which collects verification information from the GroupShare project and generates a report based on them. User can run the batch task either from the "Batch Tasks" ribbon button, either on right click on Project/Project files
The batch task can be run:
- on project level
- on file(s) level
or when selecting the files from project level
The batch task can run also on finalized project(s)